Episoder
-
Francisco “Frio” Iorio discusses automating electrical system design with Augmenta and all things construction technology related with Aileen Cho and Jeff Yoders.
Sponsored by: Document Crunch
-
ENR Deputy Editor Aileen Cho chats with Jim Lockwood and Antonion Dinis about the iconic bridge engineer, including the centennial memorial of his birthday in France.
Sponsored by: Document Crunch
-
Planera Co-Founder and CEO Nitin Bhandari catches up with Aileen Cho and Jeff Yoders at ENR’s FutureTech conference in San Francisco and talks all forms of scheduling, from the critical path to the line of balance.
Sponsored by: Ace Electric
-
Buildots co-founder talks with Jeff Yoders about the scheduling platform’s new AI-powered tool to automate the line-of-balance scheduling method, replacing manual calculations and spreadsheets.
Sponsored by: https://enerfab.com/
-
A seasoned architect teaches ENR Deputy Editor Aileen Cho a thing or two about what goes into building facilities at economic, cultural and national borders.
Sponsored by: https://ineight.com/
-
ENR Editors Aileen Cho and Jeff Yoders talk to a military and construction veteran whose leadership in promoting worker physical safety has broadened to include mental health.
Sponsored by: https://ineight.com/
-
ENR Deputy Editor Aileen Cho talks to one of her former newsmakers about his special method of helping airports deliver big projects.
-
ENR Editors Aileen Cho and Jeff Yoders in 2024 chatted with attendees of the Best of the Best and Top 25 Newsmakers events, including newsmaker Robert Buckley (pictured). This year’s events are happening March 27!
-
A dynamic duo discusses how they copilot billions of dollars’ worth of projects for AECOM Tishman’s New York office.
-
Oracle Industry Lab Vice President of Innovation Burcin Kaplanoglu returns to the Critical Path to talk with Jeff Yoders about artificial intelligence and how it will change construction processes in 2025 and beyond. Robotics, drone technology and other construction tech make it into their conversation as well.
-
The deputy CEO for megaproject delivery chats with ENR Deputy Editor Aileen Cho about creating better collaboration with the A/E/C community.
-
The entrepreneur, inventor and co-founder of Modern Hydrogen talks pyrolysis, carbon capture – and what he wishes he’d done differently in college.
-
ENR editors Aileen Cho and Jeff Yoders interview one of their own – the former ENR editor-in-chief – in a retrospective of her groundbreaking, adventure-filled career.
-
Rosendin’s Au and SFO’s Louie discuss the challenges of building high-tech networks into the $2.4B Harvey Milk Terminal 1.
-
The president and CEO discusses the firm’s growth strategies, the crucial area of water resources—and GZA the rapper.
-
ENR Editor Aileen Cho talks with the retired Army Corps veteran about his experiences with post-disaster responses and water-related risks, including after Superstorm Sandy.
-
Josh Levy and Trent Miskelly are out to disrupt document review in construction after founding artificial intelligence-powered Document Crunch. Jeff Yoders crunches the words with these entrepreneurs in a tech talk on the ENR Critical Path podcast.
- Vis mere